Zip Panelling: Sizes & Specifications

Four point Bending Test
Compressive Strength Test
Racking Test (shear Strength test)
Weight
Axial Load Bearing
Sound Transmission (STC)
Fire Resistant (rating)
Thermal Conductivity (K)
Surface Flame
Combustibility Test
Anchor Test
Crowd Pressure Test
Pull down Test
Heavy Weight Anchor Pulldown 

50mm Panels


Concentric Load
8.435kN Single
50mm panel 30kg m2
50mm 53kN/m
50mm 45db
I hour
50mm 0.491 m2 k/w
50mm Class A
Deemed non-combustible
50mm pullout 4.6kN
50mm 2k/N
250n
3kN/m 

100mm Panels

5.993 kN
173.268 kN
20.160kN Double
100mm panel 66kg m2
100mm 115kN/m
100mm 52db
2 hours
100mm 0.291 m2 k/w


Shear Test 7.40k/N



Zip Panelling: Construction Time Comparison

Construction with Zip Panelling

Ground Floor Slab
Ground Floor Wall Panels
First Floor Panels
First Floor Wall Panels
Internal Linings
Roof Construction


Make good the site
Total 

Time

Same
2 days
1 day
2 Days
Same
Same


2 days
7 DAYS 

Conventional Construction

Ground Floor Slab
Ground Floor Framing
First Floor Framing
Roof Construction
Wall installation & Insulation
Ground Floor Brickwork
First Floor Brickwork
Internal Linings
Make good the site

Time

Same
2 days
3 days
Same
2 days
8 days
10 days
Same
4 days
29 DAYS 